Basit öğe kaydını göster

dc.contributor.authorKaya, Ayberk
dc.contributor.authorBulut, Fikri
dc.date.accessioned2020-12-19T19:35:46Z
dc.date.available2020-12-19T19:35:46Z
dc.date.issued2019
dc.identifier.citationKaya, A. & Bulut, F. (2019). Geotechnical studies and primary support design for a highway tunnel: a case study in Turkey. Bulletin of Engineering Geology and the Environment, 78(8), 6311-6334. https://doi.org/10.1007/s10064-019-01529-8en_US
dc.identifier.issn1435-9529
dc.identifier.issn1435-9537
dc.identifier.urihttps://doi.org/10.1007/s10064-019-01529-8
dc.identifier.urihttps://hdl.handle.net/11436/1342
dc.descriptionWOS: 000496080700053en_US
dc.description.abstractThe main aim of this study is to appraise the geotechnical characteristic of the rock masses and to propose the proper support design for the Cankurtaran Tunnel project situated in NE Turkey. the exhaustive engineering geological investigations were done to determine the characteristic of rock masses that primarily consist of volcanic and sedimentary rocks. the tunnel route was divided into 15 segments according to their lithological and structural properties. the rock mass rating (RMR) and Rock Mass Quality Index (Q) systems were used to determine the quality of rock masses and final tunnel lining support. To check the capacity of the suggested support units analytically, the convergence-confinement (CC) technique was applied. the efficiency of the support design, dimensions of the plastic zones and deformations were determined using the 2D and 3D numerical finite element method (FEM) modeling. the empirical support system suggested in this study reduced the total displacement and dimension of the plastic zone.en_US
dc.language.isoengen_US
dc.publisherSpringer Heidelbergen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectTunnelingen_US
dc.subjectConvergence-confinement methoden_US
dc.subjectRock mass classificationen_US
dc.subjectFEMen_US
dc.subjectTunnel lining designen_US
dc.titleGeotechnical studies and primary support design for a highway tunnel: a case study in Turkeyen_US
dc.typearticleen_US
dc.contributor.departmentRTEÜ, Mühendislik ve Mimarlık Fakültesi, İnşaat Mühendisliği Bölümüen_US
dc.contributor.institutionauthorKaya, Ayberk
dc.identifier.doi10.1007/s10064-019-01529-8
dc.identifier.volume78en_US
dc.identifier.issue8en_US
dc.identifier.startpage6311en_US
dc.identifier.endpage6334en_US
dc.relation.journalBulletin of Engineering Geology and the Environmenten_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster